SEN Plus system offers unrivalled flexibility and user safety, backed up by comprehensive testing and support for different applications.Independently tested to IEC 61439 rated up to 7600A busbar and with a short-circuit fault withstand rating up to 100kA-1s, the system is equipped to deal with large faults. Compartmentalization of the functional areas will help to reduce the risk of accidental contact to live parts during maintenance and operations. To ensure the highest operator protection additional tests have been performed, verifying the resistance against arc flash events.
Low Voltage Switchgears – SEN Plus
SEN Plus system offers unrivalled flexibility and user safety, backed up by comprehensive testing and support for different applications.Independently tested to IEC 61439 rated up to 7600A busbar and with a short-circuit fault withstand rating up to 100kA-1s, the system is equipped to deal with large faults. Compartmentalization of the functional areas will help to reduce the risk of accidental contact to live parts during maintenance and operations. To ensure the highest operator protection additional tests have been performed, verifying the resistance against arc flash events.
Company: ELECTRO GRORGE
Product Documents
Documents
You must be logged in to post a review.
Related Products
-
LOW VOLTAGE PANLE
Availability: In stockOut of stock
Masar Engineering Industrials is specialized company in sheet metal manufacturing. One of our main products panels manufacturing and assembly of panels.
LOW VOLTAGE PANLE
Masar Engineering Industrials is specialized company in sheet metal manufacturing. One of our main products panels manufacturing and assembly of panels.
-
MARSHALLING PANEL
Availability: In stockOut of stock
Marshalling Panel
Required for transformer
Substations 220/66/11KVMARSHALLING PANEL
Marshalling Panel
Required for transformer
Substations 220/66/11KV
-
8UP PANEL
Availability: In stockOut of stock
8PU.003 low-voltage switchboards are used for main and secondary distribution of electrical
.energy in practically all fields (factories, commercial buildings, hospitals, hotels etc.)8UP PANEL
8PU.003 low-voltage switchboards are used for main and secondary distribution of electrical
.energy in practically all fields (factories, commercial buildings, hospitals, hotels etc.)
-
-
RGT-12 جهاز تنظيم وحدات تحسين معامل القدره (ريجليتور مكثفات) 12 خطوة مزود بشاشة لتحليل الشبكه +3شاشة لقياس الجهد / الامبير / التردد
Availability: In stockOut of stock
It intervenes by activating a capacitor with suitable values if inductive power is drawn from the network. It intervenes by activating a shunt reactor with suitable values if capacitive power is drawn from the network.
You are requested to enter the current transformer value at first when it is energized after the connections of the device are completed. After you enter and approve this value, the system controls the transformer terminals according to the power it draws. After this test is completed, it starts the stage test and tests all stages. After the stage test is completed, it starts to intervene according to the system requirement. It has the characteristics indicated below.
3-phase voltage and 3-phase current transformer
It can compensate the inductive and capacitive systems.
Single phase, two-phase and three-phase capacitor and shunt reactor may be connected.
It shows the active power, reactive power, Cosφ, THD, total active and total reactive energy values of each phase on LCD display.
It shows the 3-phase current, 3-phase voltage or 3-phase Cosφ values on the display.
It saves the total active and total reactive energy values.
The stage (capacitor and shunt reactor) value can be entered manually.
It shows the capacitor or reactor stage values individually for each phase.
The system intervention time can be adjusted.
Capacitor discharging time can be adjusted. Inductive/ Active and Capacitive / Active ratios (%) can be adjusted.
It saves the reactive power flow of the system.
Menu is password-protected.
It saves the number of stage use.
It provides equal number of stage use for the stages with the same values.
It shows the inductive/active and capacitive/active ratios reached.
It can set the inductive/active and capacitive/active ratios desired to be reached.
The stage layout time between two stages can be adjusted.
Off set stage can be created.
Time of intervention in the capacitive loads can be changed.
Time of intervention in the inductive loads can be changed.RGT-12 جهاز تنظيم وحدات تحسين معامل القدره (ريجليتور مكثفات) 12 خطوة مزود بشاشة لتحليل الشبكه +3شاشة لقياس الجهد / الامبير / التردد
It intervenes by activating a capacitor with suitable values if inductive power is drawn from the network. It intervenes by activating a shunt reactor with suitable values if capacitive power is drawn from the network.
You are requested to enter the current transformer value at first when it is energized after the connections of the device are completed. After you enter and approve this value, the system controls the transformer terminals according to the power it draws. After this test is completed, it starts the stage test and tests all stages. After the stage test is completed, it starts to intervene according to the system requirement. It has the characteristics indicated below.
3-phase voltage and 3-phase current transformer
It can compensate the inductive and capacitive systems.
Single phase, two-phase and three-phase capacitor and shunt reactor may be connected.
It shows the active power, reactive power, Cosφ, THD, total active and total reactive energy values of each phase on LCD display.
It shows the 3-phase current, 3-phase voltage or 3-phase Cosφ values on the display.
It saves the total active and total reactive energy values.
The stage (capacitor and shunt reactor) value can be entered manually.
It shows the capacitor or reactor stage values individually for each phase.
The system intervention time can be adjusted.
Capacitor discharging time can be adjusted. Inductive/ Active and Capacitive / Active ratios (%) can be adjusted.
It saves the reactive power flow of the system.
Menu is password-protected.
It saves the number of stage use.
It provides equal number of stage use for the stages with the same values.
It shows the inductive/active and capacitive/active ratios reached.
It can set the inductive/active and capacitive/active ratios desired to be reached.
The stage layout time between two stages can be adjusted.
Off set stage can be created.
Time of intervention in the capacitive loads can be changed.
Time of intervention in the inductive loads can be changed.
-
RGM-07E جهاز تنظيم وحدات تحسين معامل القدره (ريجليتور) 7 خطوة
Availability: In stockOut of stock
It intervenes by activating a capacitor with suitable values if inductive power is drawn from the network. When it is energized after the connections of the device are completed, it controls the current transformer terminals by holding and releasing the stages respectively. After this test, it starts to intervene in the system. The memory input terminal is shorted out and the current transformer connection test is stored. It has the characteristics indicated below.
Single phase voltage and single phase current transformer.
It can compensate the inductive systems.
Easy-to-use
It shows the Cosφ value of the relevant phase to which it is connected on the display.
It functions through the method of holding and releasing respectively.RGM-07E جهاز تنظيم وحدات تحسين معامل القدره (ريجليتور) 7 خطوة
It intervenes by activating a capacitor with suitable values if inductive power is drawn from the network. When it is energized after the connections of the device are completed, it controls the current transformer terminals by holding and releasing the stages respectively. After this test, it starts to intervene in the system. The memory input terminal is shorted out and the current transformer connection test is stored. It has the characteristics indicated below.
Single phase voltage and single phase current transformer.
It can compensate the inductive systems.
Easy-to-use
It shows the Cosφ value of the relevant phase to which it is connected on the display.
It functions through the method of holding and releasing respectively.
-
Low Voltage Switchgears – SEK/SEV 32
Availability: In stockOut of stock
The standardized and type tested low voltage power distribution system from GE. The switchboard assemblies leave the manufacturing plant fully tested and ready for installation & commissioning.
Low Voltage Switchgears – SEK/SEV 32
The standardized and type tested low voltage power distribution system from GE. The switchboard assemblies leave the manufacturing plant fully tested and ready for installation & commissioning.
-
CONTROL PANEL
Availability: In stockOut of stock
Control Panel
Required for transformer
Substations 220/66/11KVCONTROL PANEL
Control Panel
Required for transformer
Substations 220/66/11KV
-
RGT-12 جهاز تنظيم وحدات تحسين معامل القدره (ريجليتور مكثفات) 12 خطوة مزود بشاشة لتحليل الشبكه +3شاشة لقياس الجهد / الامبير / التردد
Availability: In stockOut of stock
12 Levels Three-Phase Reactive Power Control Relay
The reactive power control relays are designed to decrease the reactive powers (inductive and capacities) not used by the loads in the system and drawn from the network due to the characteristics of the loads
RGT-12 جهاز تنظيم وحدات تحسين معامل القدره (ريجليتور مكثفات) 12 خطوة مزود بشاشة لتحليل الشبكه +3شاشة لقياس الجهد / الامبير / التردد
12 Levels Three-Phase Reactive Power Control Relay
The reactive power control relays are designed to decrease the reactive powers (inductive and capacities) not used by the loads in the system and drawn from the network due to the characteristics of the loads
Low Voltage Switchgears – SEN Plus
SEN Plus system offers unrivalled flexibility and user safety, backed up by comprehensive testing and support for different applications.Independently tested to IEC 61439 rated up to 7600A busbar and with a short-circuit fault withstand rating up to 100kA-1s, the system is equipped to deal with large faults. Compartmentalization of the functional areas will help to reduce the risk of accidental contact to live parts during maintenance and operations. To ensure the highest operator protection additional tests have been performed, verifying the resistance against arc flash events.

Reviews
There are no reviews yet.